The "Planned maintenance time" is the estimated time needed to perform the task. Proper scheduling of intervention times will allow you to better control the work load of each technician in the Mobility Work Analytics Module. It will be possible at any time to control the correlation between the assigned time and the time realized in the same module.

Did this answer your question?